Skip to content
Greenedge Infratech logo GREENEDGEINFRATECH

Rooftop solar in Aligarh

Your local solar company in Aligarh

Greenedge Infratech is headquartered in Aligarh and has worked here since 2016. As a registered PM Surya Ghar vendor in Uttar Pradesh, we design and install rooftop solar for homes, housing societies, shops, factories and institutions, and handle the subsidy and DVVNL net metering for you.

  • Head office in Aligarh
  • PM Surya Ghar vendor (UP)
  • DVVNL net metering handled
  • Free site survey

Subsidy for Aligarh homes

Up to ₹1,08,000 off a home system

Homes in Aligarh can combine the central PM Surya Ghar subsidy (up to ₹78,000) with the Uttar Pradesh state subsidy through UPNEDA (up to ₹30,000). A 3 kW system qualifies for the full ₹1,08,000 if the home is eligible.

Because Greenedge is a registered vendor in Uttar Pradesh, you can select us on the National Portal, and we take care of the application, documents, inspection and net meter.

Subsidy is approved and paid by the government after installation and inspection, subject to eligibility and funds. Commercial and industrial connections are not covered.

Subsidy for eligible homes in Aligarh and Uttar Pradesh: 1 kW Rs 45,000, 2 kW Rs 90,000, 3 kW and above Rs 1,08,000 (central plus UP state).

How much will solar generate in Aligarh?

In western Uttar Pradesh, each kW of rooftop solar produces roughly 120–135 units a month on average across the year. Output is higher from March to June and lower during the December–January fog, so we size every system from your last 12 months of bills.

System sizeAverage units / monthSuits a monthly use of
2 kW240–270up to about 250 units
3 kW360–405about 300–400 units
5 kW600–675about 500–650 units
10 kW1,200–1,350shops, societies, small units

Estimates for a shadow-free, south-facing roof. Actual output depends on shade, tilt, cleaning and equipment.

Aligarh’s dust: keep panels clean

Dust from roads, construction and dry winds settles on panels quickly in Aligarh, especially from April to June. Uncleaned panels can lose a noticeable share of their output within weeks.

  • Rinse with plain water and a soft mop about twice a month in dry months, and after dust storms.
  • Clean early morning or evening, when panels are cool. No detergent, hard brushes or pressure washers.
  • Never walk on the panels; use the walkway our structure leaves.

Prefer not to do it yourself? We offer cleaning and maintenance plans in Aligarh, including for plants installed by others.

Greenedge technician washing rooftop solar panels with a water hose at Hope Hospital, Ramghat Road, Aligarh
Our technician cleaning the rooftop solar plant at Hope Hospital, Ramghat Road, Aligarh.

From enquiry to net meter

Net metering with DVVNL in Aligarh

In Aligarh, electricity is supplied by Dakshinanchal Vidyut Vitran Nigam Ltd (DVVNL). We coordinate every step with them.

  1. 1

    Free site survey

    Our engineer from the Aligarh office checks your roof, shade, structure and sanctioned load, and studies your bills.

  2. 2

    Portal application

    We help you register on pmsuryaghar.gov.in, select DVVNL as your DISCOM and choose Greenedge as vendor.

  3. 3

    DVVNL feasibility

    DVVNL checks that your connection and local transformer can take the system.

  4. 4

    Installation

    Usually 1–3 days once material reaches site: structure, panels, inverter, earthing and protection.

  5. 5

    Inspection & net meter

    DVVNL inspects the system and installs the net meter; the commissioning certificate is generated on the portal.

  6. 6

    Subsidy credited

    You submit bank details; the central subsidy comes to your account, and the UP state subsidy follows through UPNEDA.

Approvals and the net meter usually take a few weeks, depending on DVVNL’s workload. See the full process.

Across Aligarh and nearby districts

From our Aligarh head office we cover Aligarh city and towns across the district, including Khair, Atrauli, Iglas and Gabhana, as well as the neighbouring districts of Hathras, Mathura, Etah, Kasganj, Bulandshahr and Amroha.

Visit our office

Greenedge Infratech Private Limited
Opp. BJP Office, Kayampur, Quarsi Bypass,
Aligarh, Uttar Pradesh 202001

Monday to Saturday, 9:00 AM to 6:00 PM

Call +91 98370 67681 Open in Google Maps →

Service area map: head office in Aligarh, serving Aligarh, Bulandshahr, Amroha, Mathura, Kasganj, Etah and Hathras.

In the community

Helping Aligarh families apply for PM Surya Ghar

We organise PM Surya Ghar registration camps in Aligarh’s colonies, where residents can check their eligibility, understand the subsidy and get help registering on the National Portal.

At our camp in Shivaji Puram Park, Swarn Jayanti Nagar, residents were joined by chief guest Manvendra Pratap Singh, MLC from the Agra graduates’ constituency.

Want a registration camp in your colony or society? Call +91 98370 67681 and we will plan it with you.

See more of our work and community camps →

PM Surya Ghar registration camp organised by Greenedge Infratech at Shivaji Puram Park, Swarn Jayanti Nagar, Aligarh, with residents seated in front of the guests and a scheme banner
PM Surya Ghar registration camp organised by Greenedge Infratech at Shivaji Puram Park, Swarn Jayanti Nagar, Aligarh, with chief guest Manvendra Pratap Singh, MLC (Agra graduates’ constituency).

Get a solar plan for your Aligarh home or business

Tell us your locality and monthly bill. Our Aligarh team will call you, visit your site and give you a written proposal with the subsidy you can apply for.

  • No charge and no obligation for the survey
  • Sizing from your actual bills
  • Every brand and model listed in the quotation

Prefer to talk? Call +91 98370 67681 or WhatsApp us.

Book your free site survey in Aligarh

Share your details and a Greenedge solar expert will call you within one working day.

I would like

Prefer to talk now? Call +91 98370 67681 or WhatsApp us.

Frequently asked questions

Do you have an office in Aligarh?
Yes. Greenedge Infratech is headquartered in Aligarh, and our survey, installation and service teams work from here. You are welcome to visit during office hours.
Which electricity company handles net metering in Aligarh?
Dakshinanchal Vidyut Vitran Nigam Ltd (DVVNL). You select DVVNL on the PM Surya Ghar portal, and we coordinate the feasibility check, inspection and net meter with them.
How much subsidy can I get for solar in Aligarh?
Eligible homes get up to ₹78,000 central subsidy under PM Surya Ghar plus up to ₹30,000 from the UP government, so up to ₹1,08,000 for a 3 kW or larger system. Housing societies get ₹18,000 per kW for common facilities.
How much does a rooftop solar system cost in Aligarh?
For a typical home on-grid system, budget roughly ₹55,000–65,000 per kW before subsidy, depending on the panels, inverter and structure. Our calculator gives a range for your bill, and the site survey gives an exact quotation.
Will solar work in Aligarh’s winter fog?
Yes, but output is lower on foggy December–January days and higher from March to June. Net metering balances this over the year, which is why we size systems from 12 months of bills.
Do you serve areas outside Aligarh city?
Yes. We cover towns across Aligarh district such as Khair, Atrauli, Iglas and Gabhana, and nearby districts including Hathras, Mathura, Etah, Kasganj, Bulandshahr and Amroha.

Thinking about solar? Start with a free site survey.

Our engineer checks your roof, load and bill, then gives you a written quotation and subsidy guidance. No obligation.